Status update

Framing is about 85% complete. Onto the last few walls, might take a little longer than some of the other walls. Securing the top plate for the framing is going to be a challenge, there is low hanging ducts and electrical wiring in the way. We're going to box the soffits and then build the wall under the soffit. Hoping to have the framing complete in the next 2 weeks, then onto wiring.




Oh and we did a little shopping in between framing on saturday. Picked up a box or two of laminate flooring and a bunch of 2x4's and 2x2's for framing and soffits. Oh, and some electrical outlets and boxes.